A girl who enjoys giving and receiving spankings, and wants to share her spanking experiences
Sunday, August 28, 2022
Cell phone didn't charge overnight
Tuesday, October 05, 2021
Rummy bears
- Place gummy bears in an air-tight container.
- Fill the container with your favourite rum (I used Cruzan coconut rum) such that it barely covers the gummies and stir.
- Let them soak overnight.
- Take them out of the boozy solution to dry and bounce back to gummy form.
- Eat!
Monday, July 19, 2021
Making chili from scratch, but with a kit
On Sunday, I made chili that came in a small kit. It included raw beans that required soaking overnight.
I see why I like buying canned beans to make chili. I don't have to deal with soaking them, simmering them, and then getting to the actual chili-making phase. I went through the whole process and my chili turned out well.
Frankly, I like making my own chili. I can control the sodium in it. I used a chili flavour pack that came with this kit and it had more salt than I was used to.
The chili tasted a lot better a few hours later. I imagine that it will be fabulous later on today. I made a lot and it's so filling. I may change things up and make nachos with some of it.
I have two more weeks before there's a long weekend. I am enjoying not doing as many online Zoom calls. It's so much better to use see the world as safely as possible.
Sunday, December 01, 2019
Late checkout, noise, and customer service
I am at home, ending my staycation. My last evening at the hotel was nice. After work, I headed to the check-in counter and asked the man there if I could do a late checkout on Saturday. He asked when. I said 2 pm. He made it 3 pm. Nice!
He asked me how my stay was. I said that it was great. The only bad thing was construction along highway 401. Drilling and construction starts between 10 pm to 11 pm, and runs overnight. I said that it's rather disruptive. The good thing is that I come equipped with earplugs, so I'm good.
He apologized and advised that hotel management has asked the construction folks to change the time. It obviously hasn't helped. This construction is building a train line underground.
What I did expected was a knock on the door an hour after I had talked to him. He personally came up to my room to deliver some snacks and drinks, to apologize for the noise. I appreciated it and thanked him.
That's great customer service. Sadly, this construction goes until 2021.
